cabonne Council colour 200 wide

 

 

 

 

 

 

 

 

 

11 October 2017

 

NOTICE OF Extraordinary Council Meeting

 

Your attendance is respectfully requested at the Extraordinary Meeting of Cabonne Council convened for Tuesday 17 October, 2017 commencing at 2.00pm, at the Cabonne Council Chambers, Bank Street, Molong to consider the undermentioned business.

 

Please note a workshop will be held following the Extraordinary Meeting to discuss:

 

·         Code of Conduct

·         Cabonne LGA Road Network – construction & maintenance, planning & programming

·         Canowindra Health Centre

 

 

Yours faithfully

SJ Harding

GENERAL MANAGER

 

 

ORDER OF BUSINESS

 

1)       Open Ordinary Meeting

2)       Consideration of Mayoral Minute

3)       Consideration of General Manager’s Report

4)       Resolve into Committee of the Whole

a)    Consideration of Called Items

b)    Consideration of Closed Items

5)      Adoption of Committee of the Whole Report

 

 

 

http://cc2k/intranet/images/cabonne%20Council%20colour.JPG

 

 

 

COUNCIL’S MISSION
“To be a progressive and innovative Council which maintains relevance through local governance to its community and diverse rural area by facilitating the provision of services to satisfy identified current and future needs.”
 

 

 


         

 

 

 

 

 

 

 

 

COUNCIL’S VISION
Cabonne Council is committed to providing sustainable local government to our rural communities through consultation and sound financial management which will ensure equitable resource allocation.
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 


GENERAL MANAGER’S REPORT ON MATTERS FOR DETERMINATION SUBMITTED TO THE Extraordinary Council Meeting TO BE HELD ON Tuesday 17 October, 2017

Page 1

TABLE OF CONTENTS

 

 

 

ITEM 1      APPLICATIONS FOR LEAVE OF ABSENCE.................................. 1

ITEM 2      DECLARATIONS OF INTEREST....................................................... 1

ITEM 3      DECLARATIONS FOR POLITICAL DONATIONS.......................... 1

ITEM 4      DRAFT PLAN OF MANAGEMENT - VILLAGE GREEN, MOLONG, BEING LOT 22 DP 569966............................................................................................... 1

ITEM 5      STRONGER COUNTRY COMMUNITIES FUND............................. 1   

 

ANNEXURE ITEMS

 

ANNEXURE 4.1    POM - Molong Village Green.docx........................ 1

ANNEXURE 4.2    Attachment 2 - submissions...................................... 1

ANNEXURE 4.3    Attachment 3 - reports referred to................. 1

ANNEXURE 4.4    Attachment 4 - background information....... 1 

 


 

ITEM 1 - APPLICATIONS FOR LEAVE OF ABSENCE

REPORT IN BRIEF

 

Reason For Report

To allow tendering of apologies for councillors not present.

Policy Implications

Nil

Budget Implications

Nil

IPR Linkage

4.5.1.g - Code of Meeting Practice adopted and implemented.

Annexures

Nil   

File Number

\OFFICIAL RECORDS LIBRARY\GOVERNANCE\COUNCIL MEETINGS\COUNCIL - COUNCILLORS LEAVE OF ABSENCE - 869533

 

 

Recommendation

 

THAT any apologies tendered be accepted and the necessary leave of absence be granted.

 

General Manager's REPORT

 

A call for apologies is to be made.

 

ITEM 2 - DECLARATIONS OF INTEREST

REPORT IN BRIEF

 

Reason For Report

To allow an opportunity for councillors to declare an interest in any items to be determined at this meeting.

Policy Implications

Nil

Budget Implications

Nil

IPR Linkage

 4.5.1.g - Code of Meeting Practice adopted and implemented.

Annexures

Nil   

File Number

\OFFICIAL RECORDS LIBRARY\GOVERNANCE\COUNCIL MEETINGS\COUNCIL - COUNCILLORS AND STAFF DECLARATION OF INTEREST - 2017 - 869534

 

 

Recommendation

 

THAT the Declarations of Interest be noted.

 

General Manager's REPORT

 

A call for Declarations of Interest.

 

ITEM 3 - DECLARATIONS FOR POLITICAL DONATIONS

REPORT IN BRIEF

 

Reason For Report

To allow an opportunity for Councillors to declare any Political Donations received.

Policy Implications

Nil

Budget Implications

Nil

IPR Linkage

 4.5.1.g - Code of Meeting Practice adopted and implemented.

Annexures

Nil   

File Number

\OFFICIAL RECORDS LIBRARY\GOVERNANCE\COUNCIL MEETINGS\COUNCIL - COUNCILLORS DECLARATION OF POLITICAL DONATIONS - 869536

 

 

Recommendation

 

THAT any Political Donations be noted.

 

General Manager's REPORT

 

A call for declarations of any Political Donations.

 

ITEM 4 - DRAFT PLAN OF MANAGEMENT - VILLAGE GREEN, MOLONG, BEING LOT 22 DP 569966

REPORT IN BRIEF

 

Reason For Report

To obtain council's resolution to adopt the Plan of Management for the Molong Village Green

Policy Implications

The Plan of Management, once adopted by council, would form part of council's asset manegement procedure.

Budget Implications

Nil

IPR Linkage

3.3.5.a Review community need for new and upgraded facilities

Annexures

1.  POM - Molong Village Green.docx

2.  Attachment 2 - submissions

3.  Attachment 3 - reports referred to

4.  Attachment 4 - background information    

File Number

\OFFICIAL RECORDS LIBRARY\PARKS AND RESERVES\PLANNING\PLANS OF MANAGEMENT - 870018

 

 

Recommendation

 

THAT the draft Plan of Management for the Village Green, being Lot 22 DP 569966, corner Gidley and Bank streets, Molong be adopted.

 

 

Director of Environmental Services' REPORT

 

Subsequent to the report to council meeting of 25 July 2017, a draft Plan of Management (POM) for the use and management of the Village Green at Molong was placed upon public exhibition and comments invited. (Copy of draft POM attached)

 

Copies of the draft plan were provided to local interest groups including the Yarn Market, Garden Club, Molong Town Beautification Committee, RSL sub Branch, Molong Rotary Club and Molong Advancement Group. The exhibition was notified in the media and via council’s web page. The Molong Express also provided extensive reporting of the draft POM.

 

By the close of the exhibition period, four submissions had been received and are summarise below:

 

Submission

Comment

Molong RSL sub branch

Request inclusion of a cenotaph in the POM

Noted.

The Yarn Market has indicated no objection to a cenotaph.

Mrs A Dowling

Suggesting the picnic shelter / rotunda be retained in its current form and location

 

Noted.

Mr B Dowling

States the gazebo should be retained in its current location. Refers to council consultation and a community questionnaire undertaken in 2011.

 

Noted.

 

Yarn Market

No objection to the inclusion of a cenotaph within the Village Green.

 

Noted.

Molong Advancement Group

·    Requests ‘that common sense prevails and the shade structure be left where it is’.

·    Advises that MAG has sought quotes to refresh the community notice boards and could incorporate the Village Green identification within the revised sign content, and the sign retained within the site.

·    Disagrees with parking restrictions introduced into Gidley Street near the Village Green.

 

Noted.

 

 

 

 

Noted.

 

Noted.

Separate issue to the POM.

 

A POM is a requirement for council owned or managed land classified as ‘community land’. The document, developed with community consultation, identifies issues affecting public open space and outlines how that open space is intended to be used, improved, maintained and managed in the future.

 

The Village Green has become a contested space, with competing requests received by council as to the presentation and function of that land. The public submissions generally do not address the broad aims and objectives of the POM, instead seeking to address specific projects mentioned within the application of the wider document.

 

The submissions do not provide comment upon the body of the draft POM (Sections 1 to 12). The continued use of the space for passive recreation and community events is integral to the draft POM. Likewise the draft POM provides for additional features including seating, picnic shelter and landscaping opportunities, based upon the concept of keeping the core of the land as open space.

 

The specific concerns of the RSL sub branch can be addressed, as the draft POM does not preclude a memorial; rather it sets guidelines for where it could be located within the site. Accommodating a memorial may require adjustment to other existing features such as the location of the flag pole. Council’s consideration of a development application  would take into account the POM and the relevant legislation.

 

Three submissions do not support the concept of planning into the future to retain the Village Green as passive open space, and to reinstate the valued vistas to and from the historic stables buildings and adjacent streetscape, in that they each seek to retain an existing shade structure in its current central location. The draft POM acknowledges the opportunities to achieve the original objective of providing the site as a village green and the benefits of providing adequate facilities to encourage passive recreation and community use of the land. Suggestions were provided within the Village Green site inventory as to how these objectives may be achieved. The level of maintenance and  enhancement of the Village Green would be subject to  future budget consideration and allocation by council.

 

To assist councillors in considering the submissions, copies of the council reports from February and October 2011 and the community survey results relating to the construction by MAG of a rotunda / gazebo / picnic shelter (as referred to in the submissions) are attached. Also included with the historic reports are copies of correspondence received by council relating to local community and visitor reaction to the recent structures placed within the Village Green.

 

ITEM 5 - STRONGER COUNTRY COMMUNITIES FUND

REPORT IN BRIEF

 

Reason For Report

For Council to finalise priorities for projects to be submitted for funding under the Stronger Country Communities Fund

Policy Implications

Nil

Budget Implications

$816,644 in funding from the Stronger Country Communities Fund

IPR Linkage

3.3.5.a Review community need for new and upgraded facilities

Annexures

Nil   

File Number

\OFFICIAL RECORDS LIBRARY\GRANTS AND SUBSIDIES\PROGRAMS\STRONGER COUNTRY COMMUNITIES FUND - 871347

 

 

Recommendation

 

THAT Council:

 

1.      Submit the following applications for funding under the Stronger Country Communities Fund:

a)   Expansion of Molong Early Learning Centre.

b)   Expansion of Cudal Community Children's Centre.

c)   Construction of a shared mobility access pathway to Mullion Creek School.

d)   Construction of a shared mobility access pathway at Manildra.

2.      Considers submitting a further application for an additional project or projects from the Cabonne Pedestrian Access and Mobility Plan   (PAMP).

 

Acting Economic Development Manager's REPORT

 

BACKGROUND

 

At its September Ordinary Meeting, Council resolved to prioritise the following projects for funding under the NSW Government’s Stronger Country Communities Fund:

 

1)   Expansion of Molong Early Learning Centre to double the number of placements.  Total cost: $450,000.  Funding sought: $276,000.

 

2)   Expansion of Cudal Community Children's Centre to increase placements.  Total cost: $450,000.  Funding sought: $295,000.

 

3)   Cabonne Council construction of a shared mobility access pathway to Mullion Creek School.  Total cost $105,000.  Funding sought: $105,000.

 

4)   Cabonne Council construction of a shared mobility access pathway at Manildra.  Total cost: $90,500.  Funding sought: $90,500.

 

Council also resolved to place the projects, other than the Manildra pathway, on public exhibition for 14 days for public inspection and comment. 

 

The Manildra pathway is part of the Cabonne Pedestrian Access and Mobility Plan (PAMP), which was adopted after extensive community consultation and, as such, meets the Stronger Country Communities Fund requirements for community consultation and support.

 

CURRENT SITUATION

 

At the time of writing this report, Council had received strong support for each of the proposals, with no objections to any project.   A total of 34 emails and letters of support have been submitted for the Molong Early Learning Centre, 14 for the Mullion Creek pathway and seven in support of the Cudal Community Children’s Centre.

 

Cabonne Council has been allocated a little over $1.6 million under the Stronger Country Communities Fund, with $816,644 available for the current round of funding.

 

In preparing to lodge the formal grant application, Council’s Grants Officer has been liaising closely with the Molong Early Learning Centre and Cudal Community Children’s Centre.  During these discussions, budgets have been reviewed and revised, with the Molong centre now seeking $260,970 in grant funding and the Cudal centre $290,346.

 

Combined with Council’s shared mobility access pathway projects (Mullion Creek $105,000 and Manildra $90,500), the total amount sought for funding under the program now is $746,816 – about $70,000 less than Council’s allocation in the current round.  This leaves Council the option of submitting another shared mobility access pathway project from the PAMP as these projects meet the Government’s shovel readiness and community consultation requirements.

 

Pathways at Canowindra ($208,000), Molong ($179,000), Cumnock ($113,500), Eugowra ($95,000), Yeoval ($91,300), Cudal ($65,000) and Cargo ($22,500) have been identified in the PAMP as being necessary to provide a network that caters to the needs of all pedestrians, including older persons, school children and people with mobility and vision impairments.

 

  


Item 4 Extraordinary Meeting 17 October 2017

Item 4 - Annexure 1

 

 

 

 

 

 

 

 

MOLONG VILLAGE GREEN

 

Draft Plan of Management

July 2017                                                                               Doc Id 855251

 


Item 4 Extraordinary Meeting 17 October 2017

Item 4 - Annexure 1

 

Table of Contents

1.      Introduction. 1

1.1         What is a Plan of Management?. 1

2.      Need for this Plan of Management. 1

3.      Requirements of the Local Government Act 1993. 1

4.      Consultation. 2

5.      Area Covered by this Draft Plan of Management. 3

6.      Ownership. 4

7.      History and Cultural Heritage. 4

8.      Legislative Framework. 6

8.1         Local Government Act 1993. 6

8.2         Zoning and Planning Controls. 6

8.3         Other Relevant Legislation. 6

Companion Animals Act 1998. 6

Disability Discrimination Act 1992. 7

9.      Category of the Land under this Draft Plan of Management. 8

9.1         Core objectives for management of Community Land categorised as a park. 8

10.    Description of Study Area and Current Permissible Activities. 8

11.    Description of Proposed Future Development and Permissible Uses. 10

11.1      Park ordinance regulations. 10

12.    Leases, Licences and other Estates. 11

12.1      Short Term Casual Hire. 11

13.    Strategy and Action Plan. 12

14.    Planning Principle. 15

15.    Review of Plan of Management. 17

REFERENCES. 15

APPENDIX A..

Cabonne LEP 2012. 16

APPENDIX B………………………………………………………………………………………………………………………………………...

    Site inventory  ……………………………………………………………………………………………………………………………  17

APPENDIX C………………………………………………………………………………………………………………………………………..

    Images of Royal Hotel, Molong ………………………………………………………………………………………………….. 26

 


 


Item 4 Extraordinary Meeting 17 October 2017

Item 4 - Annexure 1

 

1.    Introduction

 

1.1    What is a Plan of Management?

A Plan of Management is a document that identifies issues affecting public open space and outlines how that open space is intended to be used, improved, maintained and managed in the future. A Plan of Management is typically accompanied by a concept plan or a landscape plan that show proposed changes to that open space.

 

2.    Need for this Plan of Management

The Local Government Act 1993 requires all council owned or vested land classified as Community Land to be managed and used in accordance with a Plan of Management.

 

3.    Requirements of the Local Government Act 1993

This Plan of Management (PoM) has been prepared in accordance with the requirements of the Local Government Act 1993.  Requirements of the Local Government Act for the contents of a Plan of Management and where these are located in this Plan are listed in Table 1.

 

TABLE 1

Contents of a Plan of Management required under the Local Government Act 1993

Requirements of the Local Government Act 1993

How this Plan satisfies the Act

A description of the condition of the land, and of any buildings or other improvements on the land as at the date of adoption of the Plan of Management.

Refer to Section 10

A description of the use of the land and any such buildings or improvements as at the date of adoption of the Plan of Management.

Refer to Section 10

Categorisation of community land.

Refer to Section 9

Core objectives for management of the land.

Refer to Section 9

The purposes for which the land, and any such buildings or improvements will be permitted to be used.

Refer to Section 11

The purpose for which any further development of the land will be permitted, whether under lease or license or otherwise.

Refer to Section 11

A description of the scale and intensity of any such permitted use or development.

Refer to Section 11

Authorisation of lease, licenses or other estates over community land.

Refer to Section 12

Performance targets.

Refer to Section 13

A means for assessing achievements of objectives and performance targets.

Refer to Section 13

 


 

 

4.    Consultation

The Local Government Act 1993 requires that prior to final adoption the draft Plan of Management must be placed on public exhibition for a period of 28 days with a further 14 days during which submissions can be received.

 

The development of the Plan of Management has been guided by the following consultation:

 

Public exhibition of the draft Plan of Management from 21 August 2017 until 18 September 2017, with community consultation and engagement concluding on 2 October 2017.

 

 

5.    Area Covered by this Draft Plan of Management

 

The Molong Village Green is defined by its boundaries of Bank & Gidley streets. Relevant land information details of the Village Green are as follows:

 

TABLE 2

Area

DP/Lot Information

Size (m2)

Classification

LEP Zoning

(Cabonne LEP 2012)

Village Green

Lot 22 DP 569966

1,321

Community Land

B2 Local Centre

 

1077710

6.    Ownership

 

Cabonne Council owns the Village Green in freehold title. The land is classified as Community Land.

 

 

7.    History and Cultural Heritage

 

The Village Green forms part of an original allotment, being Lot 18 in Section 24 in the Town of West Molong initially owned by William Gadd.  From the mid 1870s until 1933 the property operated as a hotel and ancillary out buildings. It was the site of the former New Royal Hotel. Built in the mid 1870s the two-storey brick hotel building held a prominent streetscape location with its dual frontages to Bank Street and Gidley Street. It is thought that the  foundations of the  hotel were laid by Jules Thomas who owned the Royal Hotel in Riddell Street, Molong (initially known as the Golden Fleece Hotel, and is the present day location of the Molong and District Historical Society Museum, corner of Gidley and Riddell Streets).  John Martin Hughes who opened the hotel to trade mid 1870s completed the construction of the New Royal Hotel. Formerly the licensee of the Union Hotel at Copper Hill, Hughes was to remain in Molong until c1882, leaving the town following the death of his wife. In 1877 Hughes had advertised that extensive additions had been made to the New Royal Hotel, and in 1881 he applied to construct a verandah. By 1882 the hotel contained 18 rooms with a shingled roof. The stone stables adjacent the hotel housed 10 stalls and 3 buggy sheds.  The hotel provide a bar and entertainment area as well as accommodation rooms. Several shops fronted the street.

 

The legendary coaching firm of Cobb & Co established its headquarters in Bathurst in 1862 and quickly established a network of postal, freight and passenger services across the region, with services connecting towns and localities across NSW, Victoria and Queensland. Cobb & Co’s first service to Molong was provided three days a week between Orange and Molong. The Golden Fleece / Royal Hotel was the depot for the Molong service, however after the New Royal Hotel was opened Cobb & Co’s booking office and stables were located there. The Cobb & Co stables were later relocated to the Freemasons Hotel in Molong.

 

The license of the hotel was taken over by John F Wynne on April 25, 1882 who carried on the business until it was transferred to George F Milgate in November 1890. Then followed William P Cahill in April 1897, James G Donaldson in July 1906, Edward Reynolds in May 1910, JM Coulon in February 1911, Herbert Lawson in June 1911, Edwin Ingram and John T Colbran in May 1913. Extensions to the hotel increased the number of rooms from the earlier 18 to 30. (Refer to Appendix C).

 

Further changes to the licensees included John E Maddison in August 1918, Michael Owens in June 1920, David J Cox in January 1926, Edward G Carroll in March 1928, James J Leahy in August 1928, Ernest Scanlon in September 1930. The final licensee was P.V.B Vincent who held the license from 17 March 1931 until the hotel closed at the end of June 1933. By 1921 the hotel had started to fall into disrepair. The local licensing court held an enquiry into an application by the hotel owner (Mrs Cahill) and the licensee for cancellation of the license under the Licenses Reduction Act, and as a result, the hotel closed on 30 June 1933.

 

 

 

The site was acquired by the Rural Bank, who proposed to demolish the old hotel and construct a bank building.  The Rural Bank notified the Molong Council that Mr J Challoner of Alexandria had been granted the tender to demolish and remove the old building. Demolition work commenced in June 1944. The site however remained vacant with the bank choosing to lease premises in Bank Street.

 

In the early 1970s the newly formed Molong Yarn Market acquired the Bank Street cottage adjacent to the site. Seeing potential for use of the nearby former stone stables building, and for the residual land associated with that building, the Yarn Market members sought to purchase the land from the owner, Mr D. Betros. With their focus on the potential use of the stables building, the Yarn Market approached the Molong Council to take responsibility on behalf of the community for the care and management of the residual land, with the expressed use of that land to be a community Village Green. The allotment was subdivided in 1974 to create Lot 21 (containing the stone stables and the boundary walls of the Bank Street Yarn Market buildings) and Lot 22 (vacant land formerly containing the Royal Hotel building). The Molong Council subsequently acquired Lot 22 in DP 569966.  The Yarn Market Association members had purchased the whole of the site for $9,500 and the Molong Council agreed to acquire Lot 22 for a price of approximately $6,000, (this reflecting that the area of land to be acquired by council was approximately two thirds in area of the whole site).

 

The Molong Council held a stakeholder meeting in September 1974 to discuss the development of the Lot 22. Attending the meeting were representatives of the council, the Yarn Market, Apex, Molong RSL, Rotary as well as Parkes based architects Robinson and Cranna. The meeting was briefed on the history of the acquisition of the site, and the expressed interest by Apex to build an aged persons facility at Molong, as well as the interest of the RSL in the construction of a war memorial. The architects tabled a concept plan for the area. It was the decision of the meeting that council call a public meeting to further discuss the proposal for the use of the land.

 

The site was subsequently established as the Village Green, for use as passive recreation by the community. In the bicentennial year of 1988 a flagpole and time capsule were installed, while tree plantings and several plagues relate to events such as the bicentenary and also the Molong 150th celebrations. The Yarn Market contributed to the construction of a vine-covered pergola located along the western boundary of the site and the planting of a grove of birch trees adjacent their cottage. These element were generally in accordance with the architect’s concept plan for the site as  discussed with the community in 1974.

 

 In recent years a picnic shelter / rotunda has been constructed as an initiative of the Molong Advancement Group, while a war memorial was constructed by the Molong RSL sub-branch. The war memorial was damaged in May 2017 and the monument since removed from its base.

 

Cabonne Council has added perimeter seating, lighting, a community notice board, limestone boulders, water bottle filling station and directional signage either within the park area or along the boundary.

8.    Legislative Framework

This section comprises the Basis for Management for the Village Green.  It describes the legislative and policy framework applying to the land.

 

8.1    Local Government Act 1993

The Village Green is owned by Cabonne Council and classified as Community Land.  Requirements of the Local Government Act for a Plan of Management for Community Land are shown in Table 1.

 

8.2    Zoning and Planning Controls

The Environmental Planning and Assessment Act 1979 (EP & A Act) establishes the statutory planning framework for environmental and land use planning in NSW through State Environmental Planning Policies (SEPPs) and Local Environmental Plans (LEPs).

 

The Cabonne Local Environmental Plan 2012 zones the Village Green as B2 Local Centre.  The planning objectives of the Zone are listed in appendix A.

 

The LEP sets out in general terms what types of developments and uses are permissible within the B2 Zone and which activities or development requires development consent.  Development and activities authorized in the Plan of Management need to be permissible and consistent with the zoning objectives of the Cabonne LEP 2012 or any updated planning instrument that supersedes the Cabonne LEP 2012.

 

Development or use activities requiring a Development Application will be assessed under the Environmental Planning and Assessment Act 1979.  Impacts of proposed activities or development will be assessed under 79(c) of the Environmental Planning and Assessment Act 1979.

 

The Village Green is located within the Bank Street Heritage Conservation Area as defined by clause 5.10 of the Cabonne Local Environmental Plan 2012. It adjoins items of local heritage significance and contributes to the historic value of the precinct.

 

The site is situated within the Outer Floodplain as defined by the Molong Flood Study. Development Control Plan 10 – Flood Prone Land in Molong applies to the land and would be taken into account by council when determining any development application for the land.

 

The eastern half of the site is mapped as being impacted by limestone karst geology and the relevant karst clause of the Cabonne Local Environmental Plan 2012 would apply when determining any development application for the site.

 

8.3    Other Relevant Legislation

Heritage Act 1977

The Heritage Act 1977 aims to protect the environmental heritage including the archaeological heritage of a site. The Act applies to all land in NSW.

Companion Animals Act 1998

The Companion Animals Act 1998 aims to promote responsible animal ownership in NSW.  Under the Act dogs in public places must be on a lead under the effective control of a competent person, except in a declared off lease area.  Dogs are prohibited within 10 metres of children’s play areas, food preparation/consumption areas and recreations areas where dogs are prohibited by the local authority.  If a dog defecates in a public place, the owner must remove and dispose of the waste in a rubbish receptacle.

 

Disability Discrimination Act 1992

The Disability Discrimination Act 1992 aims to eliminate, as far as possible, discrimination against people with disabilities in many areas, including access to premises.

 

 

9.    Category of the Land under this Draft Plan of Management

It is a requirement of the Local Government (Community Land Management) Act 1998 to categorise the subject land as per s.36(4) of the Act.

 

The Village Green has been categorised in accordance with the guidelines in the Local Government Amendment (Community Land Management) Regulation 1999.

 

In summary the proposed category for this Plan of Management is as follows:

 

·    Park

 

The core objectives of this category is described in Section 9.1

 

9.1    Core objectives for management of Community Land categorised as a park

The Local Government Act 1993 establishes core objectives for all categories of community land.  Council must manage the community land in accordance with the core objectives of the relevant category of land.  Any Council objectives must comply with the core objectives established with the Act.  The significance of the prescribed core objectives is to ensure that any activities or uses of the land are consistent with the core objectives for that category of land.

 

Categorised as a Park under s36(4) the core objectives of this category as per the Act are:

 

a)    To encourage, promote and facilitate recreational, cultural, social and education pastimes and activities; and

b)    To provide for passive recreational activities or pastimes and for the casual playing of games; and

c)    To improve the land in such a way as to promote and facilitate its use to achieve the other core objectives for its management.


 

10.  Description of Study Area and Current Permissible Activities

The legislation requires a description of the current condition and use of the Village Green as per the following requirements.

 

TABLE 3

Local Government Act

Clause

Requirement

36(3A) (a) (i)

Condition of the land, and of any buildings or other improvements on the land, as at the date of adoption of the Plan of Management.

36 (3A) (a) (ii)

The use of the land and any such buildings or improvements as at that date.

 

The following tables make reference to the specific clauses in the legislation and provides a response to the requirements of the clause. An inventory of the site’s elements is included in appendix B. In providing an assessment of the current condition, the following definitions have been used:

Good – new or well maintained

Fair – maintained but in need of repair

Poor – in need of major repair/demolition

 

TABLE 4

Description of Study Area and Current Permissible Uses

Item

Description

Condition Clause 36(3A) (a) (i)

Current Use Clause 36(3A) (a) (ii)

Structures

Rotunda/ picnic shelter

Vine covered pergola

Good

 

Good

Passive recreation

 

Passive recreation

Grass surface

Level grass surface within park curtilage

Good

Passive recreation

Tree Planting

Trees planted around north east and south west park perimeter. Centrally located specimen tree.

Fair

Strategies for treatment of trees to be considered to ensure longevity

Contribute to park identify, amenity and structure

Park Amenities / Furniture / Lights

Flag pole

Seats

Bins

Water dispenser.

Strategically placed limestone boulders.

Plaques / memorials.

Base of plaque – RSL memorial.

Community notice board.

Directional signage.

Light posts and lighting.

Decorative lighting of specimen tree.

Good

Good

Good

Fair

NA

 

Fair

Poor

 

Fair

 

Fair

Good

 

Fair

Park amenity

 

11.  Description of Proposed Future Development and Permissible Uses

The legislation requires a description of the future use and development/improvements that will be allowable in the Village Green as per the following requirements.

 

TABLE 5

Local Government Act 1993

Clause

Requirement

36 (3A) (b) (i)

Specify the purposes for which the land and any such buildings or improvements will be permitted to be used.

36 (3A) (b) (ii)

Specify the purposes for which any further development of the land will be permitted, whether under lease or license or otherwise.

36 (3A) (b) (iii)

Describe the scale and intensity of any such permitted use or development

 

Under the Local Government Act uses and development with land classified as community land must be consistent with the Park’s categorization (section 9) and the core objectives (section 9.1) of the category.

 

The following tables refer to the specific clauses in the legislation and provide a response to the requirements of each clause.

 

TABLE 6

MOLONG VILLAGE GREEN

Description of proposed future development and permissible use

Item

The purposes for which the land and any such buildings or improvements will be permitted to be used

 

 

Clause 36 (3A) (b) (i)

The purposes for which any further development of the land will be permitted, whether under lease or license or otherwise

Clause 36 (3A) (b) (ii)

The scale and intensity of any such permitted use or development

 

 

 

 

Clause 36 (3A) (b) (iii)

Park area

Continue use for unstructured, informal recreation including children’s play, community events.

Development for the purposes of reinforcing the visual and landscape character of the Park, amenities to facilitate use and enjoyment of the Park including but not limited to seats and shelters.

Organised park events to occur between hours of 7am – 10pm.

 

 

 


 

11.1  Park ordinance regulations

The Council will adopt a cooperative, flexible approach to possible activities that may occur within the Park as long as these activities are consistent with the designated categories and core objectives of the Park.  A guiding principle will be that the safety and convenience of everyone using the Park must be respected will apply in all situations.  In general, activities prohibited include any act that will cause inconvenience or injury to others and any act that may cause damage to the Park.

 

Activities that may require permission and approval from Council include but are not limited to:

 

·    Driving or parking of vehicles in the Park;

·    Sale of goods/services

·    Organised events;

·    Amplified music/performances;

·    Commercial filming.

 

Activities that are generally prohibited:

·    Drinking of alcohol (noting that council will consider applications for exemptions to restrictions in association with development applications for events)

 

12.  Leases, Licenses and other estates

The Local Government Act 1993 requires that any lease or license of community land be authorised by a Plan of Management.  Leases and licenses formalise the use of community land by groups and organisations.  Activities must be compatible with the LEP zoning of the land and provide benefits, services, or facilities for users of the land.

 

The maximum period for licenses/leases on community land allowable under the Local Government Act is 21 years for purposes consistent with the categorization and core objectives of the particular area of community land.  Community land may only be leased or licensed if public notice is given as per the requirements of the Local Government Act.

 

Where a lease arrangement has been entered into with Council for community land, subleasing of the land must be in accordance with the requirements of section 47C of the Local Government Act. Licenses and leases for the use of the Village Green for activities need to be permissible under this Plan of Management, the Cabonne Local Environmental Plan 2012 (or any updated planning instrument), the Local Government Act 1993 and pursuant to Development Consent if required. This Plan of Management does not authorize the lease, license or grant of any other estate over the Village Green.


 

12.1  Short Term Casual Hire

Licenses will be granted for casual events including, but not limited to, the purposes listed in Table 7.  These events may generally be held within the hours of 7am and 10pm.

 

TABLE 7

Type of arrangement authorized

Land and facilities covered

Purposes for which leasing/licensing will be granted

Short term casual use license

Village Green

Purposes of community events /festivals

Playing a musical instrument, or singing for fee or reward, picnics and private celebrations such as weddings and family gatherings, filming for cinema / television, conducting a commercial photography session, public performance, engaging in trade or business, delivering a public address.

 

All short-term casual hire will be in accordance with Section 116, 117 and 188 of the Local Government (General) Regulation 2005.  However, the park may be used for civil emergency purposes when the need arises. 

 

The Local Government and Environmental Planning and Assessment Amendment (Transfer of Functions) Act 2001 transfers approvals formally required under section 68 of the Local Government Act to the Environmental Planning and Assessment Act.  These transferred approvals include installing temporary structures on land.

 

Consequently causal use hire of the park that includes the erection of temporary structure such as tents, booths, stage areas and mobile structures may require a development application. In assessing the Village Green as a venue for events, the council should apply the following criteria:

 

·    The event should not result in physical damage to the park;

·    The events should be available to all sections of the community;

·    The event should not result in a significant impact on adjacent residents;

·    Organisers of the event should be responsible for cleaning up the site and repairing any damage that may occur.

 

Fees for short term casual bookings will be charged in accordance with council’s adopted Fees & Charges at the time.


 

13.  Strategy and Action Plan

Section 36 of the Local Government Act requires that a plan of management of community land manages the land according to the objectives and methods set out below:

 

a)    The category of the land (refer to section 9);

b)    The objectives and performance targets of the plan with respect to the land;

c)    The means by which the council proposes to achieve the plan’s objectives and performance targets;

d)    The manner in which the council proposes to assess its performance with respect to the plan’s objectives and performance targets.

 

TABLE 8

Village Green

Objectives and performance targets of the plan with respect to the land s.36(b)

Means by which Council proposes to achieve the plan’s objectives and performance targets s.36(c)

Manner in which council proposes to assess its performance with respect to the plans objectives and performance targets s.36(d)

Urban Context

 

To maintain the park as a vibrant and integral component in the visual and social fabric of Molong.

 

 

Re-establish the character of the park on all street frontages by rationalising placement of park furniture and plaques.

Maintain and enhance the park as a secure place in the locality through provision of adequate lighting scheme.

 

 

Increased local use of the park measured by survey and observation.

Uses and Recreation

 

To enhance opportunities for a balanced organised and unstructured recreational use of the park.

To optimize public access to all areas of the park.

 

 

Maintain range of organised and informal / unstructured activities in the park.

Provide improved facilities for event usage so that these functions may be accommodated without adversely affecting park values.

Enforce dog management provisions as per requirements of council’s Companion Animal Management Policy.

 

 

Positive comments by event orangisers / attendees and park users.

Access and circulation

 

To improve pedestrian access into the park.

To ensure access to and within the park for people with disabilities.

 

 

Improve entranceways into park.

 

 

 

 

Conform to all relevant Australian Standards and Codes for disability access.

Traffic, Parking

 

To provide ease of pedestrian access in a safe environment and respects the park’s physical structure.

 

 

Ensure that maintenance and special event vehicular access to the park will not result in inconvenience to park users or damage to the park.

 

 

Minimal conflict between park users and service vehicles.

Landscape character and visual quality

 

To improve the landscape character and visual quality of the park.

 

 

 

Develop a consistent design for park furniture, paving, signage etc appropriate to the park’s setting.

Develop a coordinated signage strategy for the park and its boundaries.

 

 

 

Increased appreciation of the Park as measured by positive comments received by council.

Environmental Sustainability

 

To maintain and enhance the health of trees in the park.

Park improvements to have regard for environmentally sustainable design, resource use and maintenance.

 

 

Arborist to inspect trees regularly.

 

Budget allocation for care and maintenance of park assets.

 

 

Improved health of trees.

 

 

Sustainable management of council resources.

Management and Maintenance

 

To provide a clean, well maintained park.

To ensure that the park is a safe and secure place for its visitors.

 

 

 

Maintenance programs carried out in accordance with maintenance specifications.

 

 

 

Positive comments received by council.

 

 


 

14.  Planning Principles

The planning principles and related proposals encompass the major recommendations of the Plan of Management. The draft plan proposes responses to the core objectives for community land as identified in the Act apply to the Village Green. The overall aim is to maintain the Village Green as open space for passive recreation.

 

2235992

Key:

             A – Inspect and treat elm tree annually for Dutch elm disease.

 

B – Rationalise directional signage. Relocate community notice board and replace it with an interpretative sign that includes the name of the site, being the Village Green, and provides details of the history of the site.

 

C – Remove tiled concrete plinth of the damaged memorial and restore the immediate area to lawn surface.

 

D – Relocate or remove trip hazards caused by placement of limestone markers and associated plaques recording tree planting.

 

E- Consider the appropriateness of the placement of the water bottle filling station (located along the Bank Street frontage of the park).

 

F - Define key entry points to the park. Consider framing the Village Green setting by the introduction of low growing perimeter planting / garden beds or paths along sections of the Bank Street and Gidley Street boundaries. Frame vistas to and from the Village Green, including vistas of the adjacent historic stonewalls and coach house.

 

G – Relocate the picnic shelter from the centre of the park and reinstate the area as lawn. Should additional park seating or a picnic shelter structure be required, that such items be sited along the Gidley Street alignment accessed off the existing pedestrian footpath. Design and placement of additional park furniture should not interrupt the open space appeal of the Village Green.

 


 

15.  Review of Plan of Management

The Plan of Management will require regular review in order to be consistent with community values and changing circumstances.

 

The following review process is recommended:

 

·    An annual review to assess progress and implementation of actions.

·    A complete review and revision after 5 years.

 

 

REFERENCES

Department of Local Government (2000)      Practice Note No. 1 – Public Land Management


 

APPENDIX A

 

Cabonne Local Environmental Plan 2012

 

Zone B2   Local Centre

1   Objectives of zone

•  To provide a range of retail, business, entertainment and community uses that serve the needs of people who live in, work in and visit the local area.

•  To encourage employment opportunities in accessible locations.

•  To maximise public transport patronage and encourage walking and cycling.

•  To encourage mixed-use development that will promote community activity and safety without compromising business development opportunities.

2   Permitted without consent

Environmental protection works; Home-based child care; Home occupations

3   Permitted with consent

Boarding houses; Child care centres; Commercial premises; Community facilities; Educational establishments; Entertainment facilities; Function centres; Information and education facilities; Light industries; Medical centres; Passenger transport facilities; Recreation facilities (indoor); Registered clubs; Respite day care centres; Restricted premises; Roads; Service stations; Sewage reticulation systems; Shop top housing; Tourist and visitor accommodation; Any other development not specific in item 2 or 4

4   Prohibited

Agriculture; Air transport facilities; Airstrips; Animal boarding or training establishments; Boat building and repair facilities; Boat launching ramps; Boat sheds; Cemeteries; Charter and tourism boating facilities; Correctional centres; Crematoria; Eco-tourist facilities; Electricity generating works; Exhibition villages; Extractive industries; Farm buildings; Forestry; Freight transport facilities; Heavy industrial storage establishments; Industries; Jetties; Marinas; Mooring pens; Moorings; Open cut mining; Recreation facilities (major); Recreation facilities (outdoor); Rural industries; Rural workers’ dwellings; Sewerage systems; Storage premises; Vehicle body repair workshops; Waste or resource management facilities; Water recreation structures; Water supply systems; Wharf or boating facilities

 

 

 

 

 

 

 

 

APPENDIX B

 

APPENDIX B – INVENTORY OF VILLAGE GREEN INFRASTRUCTURE AS OF 17 JULY 2017

Directional signage replicating adjacent street signage. Height of pole is not pedestrian friendly.

Sign and pole are in good condition. Suggest removal of sign as it duplicates roadside directional sign. When considering signage within the Village Green consideration should be given to identifying the intended audience ie pedestrians or motorists.

Street signage adjacent to the Village Green

Located on the back of a road direction sign, this sign is one of only two that identify the adjoining area as the Village Green. The sign is in poor condition and requires revision of its information.

Community notice board, street directional signage located at the southeastern corner of the Village Green. The result is a visual confusion of signs of different sizes, colours and messages. It is suggested that an appropriate suite of signage be developed to convey the relevant information and provide visual cohesion within the setting.

Double sided community notice board. Review whether the Village Green is the most appropriate place for this type of sign, or  refresh the  advertising / information to connect with its audience (local community and or the travelling public)

Eastern face of the community board requires refreshing as the information panel artwork has faded. Review promotional information for accurateness.

Existing signage does not readily identify the area as the Village Green. It is suggested that the need for, and location of the community notice board be reviewed, and consideration given to installing an interpretative sign providing the history of the site as the former Royal Hotel.

View of Village Green from eastern side towards the north. An elm tree, base of damaged RSL memorial, limestone boulders, rotunda / picnic shelter occupy the central part of the Village Green.

Traditionally a Village Green is an open space used by the community for casual recreation such as picnics and relaxation, or for community events including markets or gatherings for meetings, remembrance or celebration ceremonies.

The Molong Village Green has lost its integrity as an area of open space through the introduction of items and structures that collectively confuse the interpretation of the area and the appeal of the space.

The base of the RSL memorial (the memorial plaque having been damaged and removed in May 2017) is located towards the centre of the Village Green. The concrete base is covered with modern day bathroom tiles and accommodates a granite base on which a polished granite monument had been erected as a memorial to the district’s servicemen and woman. The memorial was constructed c 2011, with the town’s Anzac Day services subsequently held on the Village Green and replacing the long established tradition of Anzac Day marches terminating at the War Memorial located at the nearby council building. Initially a dark green picket metal fence surrounded the park memorial, giving the effect of a cemetery headstone. The fence was later removed. The monument toppled as a result of children playing at the site. The monument has been removed from the site, leaving the damaged tiles and base. The RSL seek to replace the previously small-scale memorial with a more imposing Cenotaph proposed to be sited within the Village Green.

 

Plaque dedicating the addition of the flagpole to the Village Green as a Bi-centenary project.

The RSL sub branch, to accommodate two flags, has recently altered the single flagpole.

Time capsule – Molong 150th Anniversary Committee 1985. Capsule to be opened in 2035. This item is set into the ground amidst the limestone bounders.

Locally sourced limestone boulders added to the site by former Council Engineer, Mr Colin Crowe. The boulders have become a well-known feature of the Village Green and are a delight to children.

Village Green viewed to the north. Vista to and from the historic coach house is obstructed by the picnic shelter / rotunda.

Although located on adjacent land and in ownership separate to the Village Green, the coach house provides the primary and dominant visual backdrop to the Village Green and the adjacent streets.

Golden elm tree - specimen tree situated towards the centre of the Village Green. The tree has been affected by elm leaf beetle and will require expert horticultural care to ensure the health of the tree and its survival. An electrical conduit cable runs up the northwestern side of the tree to power a string of ornamental lights that have been suspended from the tree’s branches. The tree is illuminated at night for effect.

View north east from pergola – showing crushed aggregate pathway, light standards, electrical housing, rotunda / picnic shelter, specimen trees and coach house backdrop

 

Picnic shelter, seating and table - constructed by Molong Advancement Group (MAG) c2010. The structure was to be sited closer to Gidley Street, however has been constructed in a more central location. The design and scale of the structure has attracted public comment and some criticism, as it does not relate to the space and is not respectful of the vistas to and from the coach house. It is suggested that the structure be relocated and / or reused at more suitable location within the town. Should additional picnic shelter facilities be required for the Village Green, that the urban design and heritage advise of council’s Heritage Advisor be sought and implemented.

 

View from northeast corner of the Village Green looking across the area towards the southwest.

The light post is one of four located along the northern and western boundaries adjoining existing gravel pathways.

A cluster of trees is also located in the NE corner of the area. A callistemon, a eucalypt and a Robinia tree remain from a tree-planting program honouring local clubs. A plague placed on a limestone marker situated in front of the eucalypt indicates the Molong Red Cross donated the tree.  A limestone marker situated behind the light post (as shown in the photo opposite) acknowledged the Molong Garden Club; the donated tree apparently not surviving. The Robinia tree and the Callistemon are likely to also have been donated however; no plaques can be located to confirm this.

Marker from the Bicentenary tree planting. This marker is a trip hazard to persons visiting the Village Green, and those approaching the coach house. Representatives from the Yarn Market have recently approached the Garden Club requesting the hazard be removed. The Garden Club has notified council of its agreement to remove the marker.

Red Cross plaque and marker situated at the base of the eucalypt tree. The tree dedicated to the 75th year of the Red Cross in NSW. Whilst the anniversary date is not recorded on the plaque, it is understood that 1989 was the year marking the anniversary.

 

 

Downpipe from adjoining Yarn Market building is not connected to storm water and appears to be piped directly onto the ground within the Village Green

Cracking in eastern boundary wall of the building owned by Yarn Market. The proximity of ornamental grape and wisteria vines planted by the Yarn Market over the pergola located on the Village Green site is noted.

Picnic table and fixed seating set under the pergola. The condition of the seating, paving and pergola is good.

Recycled plastic drum – general rubbish waste bin with plastic liner – located near pergola seating

Crushed gravel pathway off main path and leading to a locked pedestrian gate servicing the Yarn Market. The path requires maintenance as grass has started to grow through the aggregate surface.

Water bottle refilling station located at Bank Street frontage – an initiative of council and Central Tablelands Water. As of July 2017 the refilling station is inoperative. The placement of the structure detracts from the Village Green and streetscape visual amenity. It is suggested that consideration be given to relocating the structure to a more suitable location for maximum benefit of the local community.

Bank Street – southern edge of Village Green – street furniture including a standard garbage bin receptacle. Three metal park benches face the Village Green in this area. The seating and bin storage receptacle are in good order. The seating is adjacent to the Village Green, the adjacent Yarn Market and in close proximity to the inter town bus pick up / drop off location. The Village Green is an alcohol free zone. The council signage advising of the restriction is attached to the bin storage unit. The sign is in good condition however, a review of the information conveyed is required. The sign advertising the Yarn Market is located close to the boundary between the Village Green and that premises. A crushed gravel path links the Bank Street concrete pedestrian pathway to the Village Green and also provides a link to the adjacent Yarn Market / Coach House property.

View to the west along the southern boundary of the Village Green towards the Yarn Market. Three silver birch trees planted by the Yarn Market are located within the Village Green adjacent to the pergola shelter.

The Village Green has no defined entry points. The space is open along both street frontages with no clearly defined guidance to the use of the space. Consideration should be given to defining the Village Green by creating the sense of arrival at a civic garden / park. Consideration of introduction of low impact gardens along the Bank Street boundary would assist in defining the space as well as providing visual and sensory experiences.

Plague attached to seat adjacent to Bank Street footpath. Providence unknown.

Road signs – Directional signage on southern side of Bank Street at the intersection with Gidley Street is faded, and potentially relates to the era when the Mitchell Highway traversed Gidley and Bank streets. Review the necessity for these signs. 

View south of the Village Green towards the Spanish Mission era architecture of the Commonwealth Bank. Retain vista / views from within the park to Bank Street.

Street trees – Desert ash planted along the Bank Street frontage are in poor condition. These trees however provide welcome shade in summer for vehicle parking. Expert horticultural care will be required to ensure the trees survive. Consideration may be required to the eventual replacement of these trees in accordance with council’s street tree masterplan.

Along the western side of Gidley Street is a row of Prunus trees. They are in poor condition and consideration should be given to replacing them with a more suitable variety. Power lines run overhead, thus limiting plantings to smaller trees. Council’s street tree planting masterplan should be considered in relation to the setting of the Village Green.

 

 

 

 

 

 

 

 

 

 

 

 

 

APPENDIX C

Images of Royal Hotel, Molong. Source – www.cobbandco.net.au Don Burns Collection

 

Molong Hotel

 

 

 

 

Royal Hotel Molong


Item 4 Extraordinary Meeting 17 October 2017

Item 4 - Annexure 2

 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


Item 4 Extraordinary Meeting 17 October 2017

Item 4 - Annexure 3

 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


Item 4 Extraordinary Meeting 17 October 2017